CW Energy has completed the installation of a rooftop solar power plant with a power of 233 kWp in Çorum Central district, in the Chamber of Commerce and Industry.

With a 233 kWp SPP installation, an average of 290 tons of CO2, 0.875 tons of SO2 and 0.32 tons of NOx gas emissions per year can be reduced, and the electricity of an average of 220 households can be met with renewable energy. It is planned to produce an average of 1,958.0 kWp per day and an average of 400,250 kWp per year in the 233 kWp SPP.