In the district of Serik, Antalya, the installation of a 1000 kWp solar roof system by the company CW Enerji.

2160 pcs. CWT-270-60P and 1668 pcs.  CWT-250-60P solar modules, manufactured by CW Enerj itself, as well as 29 pcs. ABB, TRIO 27,6-TL-OUTD-S2X-400, 3 pcs. TRIO-20.0-TL-OUTD and 2 pcs. ABB, TRIO 12.5-TL-OUTD model inverters were used in the implementation of the project.

The plant was completed in the form of an Engineering Procurement Construction (EPC) project turnkey within 19 days on 10 November 2017, as well as the temporary approval of the power plant on 27 December 2017.

With 1000 kWp of solar energy, the average energy requirement of 875 households can be covered a year, and annual emission reductions of 1163 tons of CO2, 3.5 tons of SO2 and 1.3 tons of NOX gases can be reduced. A production of 4.420 kWp per day and 1.613.612 kWp per year is required.

The investment is depreciated by the investor within 6 years, and the additionally produced electricity can be sold to the local electricity supplier at a price of 0.133 USD / kWh.

🍪 CW ENERJI COOKIE POLICY

As CW-Enerji, we make use of cookies on our page, which may also contain third-party cookies, in order to provide you with the best use and to use them in promotional activities. You can refer to our Cookie Policy to get information about the cookies we use and to learn about your rights. By continuing to visit our page, you will approve the use of cookies.

MORE INFO